On Katalon Runtime Engine 11.2.1 (Windows 11, 64 GB RAM, Java 21), every katalonc run spends about 88 seconds before the first test case starts:
- ~21 s: tries a TestCloud license first (“Failed to get organization or project info… ProjectId: null” / “Failed to activate with TestCloud license”) before “Activated successfully with Katalon Runtime Engine license”. We pass
-orgID. - ~56 s: “Start reloading plugins…” fetches the plugin list from the Katalon Store and reinstalls TestCloud Keywords 5.14.0, which our project doesn’t use.
- Every run deletes
bin/Libsand recompiles the whole project (~760 classes).
katalonc.ini has -data @noDefault and -Xmx6g. Defender exclusions and more memory made almost no difference.
Questions:
- Can the TestCloud license attempt be skipped, or does passing a TestOps project ID stop it?
- Can the plugin reload be turned off or cached locally?
- Does a fixed
-dataworkspace let KRE reuse plugins and compiled classes between runs? - Is a Test Suite Collection the recommended way to pay this startup once for several suites?
Has anyone cut KRE startup time on 11.x?