How to switch Testing lanes quickly from Dev to Staging to Production

Does anyone know how to use Katalon Studio to quickly be able to switch testing lanes for a Test Suite to be executed in?
I generally run my tests against our Staging lane, but would like to be able to run them quickly in Production as well, after a release. The only way I know of to do that now, is to switch ease execution URL for each individual test to use production. This is very time consuming, and Im hoping there is a better way.

Thank you!

Use profiles.

https://docs.katalon.com/katalon-studio/docs/execution-profile-v54.html